Request A Quote
Thank you for considering Girhimprom for your project needs.
We offer a wide range of specialist services in the mining and chemical industry, environmental management, construction, and engineering fields.
To help us provide you with an accurate quote, please fill out the form below with as much detail as possible about your project requirements.
A member of our team will get back to you within 1 business day.
Client Testimonials
We wholeheartedly recommend the services of the institute GIRHIMPROM, based on our excellent experience in 2017-2018. As per our agreement (No. 21/17 dated June 6, 2017), your team successfully executed the critical project of reclaiming and reconstructing land in the Yavorivsk DHHP “Sirka” operation area, Yavoriv district, Lviv region, that had been disturbed by mining activities. Your adherence to the high standards of the design brief, the quality of the workmanship, and the timely completion of the project were exceptional. We couldn't have asked for a more professional and dedicated partner for such an important environmental initiative.
In May 2018, we had the pleasure of renewing contract No. 14 with TZOV 'Institute GIRHIMPROM' for a crucial environmental project. The task was to address the contamination of groundwater and reclaim damaged lands across various mining and technological sites of the Kolyshny Kalussky potassium-magnesium extraction plant in Kalush, Ivano-Frankivsk region. The scope included the Dombrovsky quarry with new fractured rock shafts No1 and No4, tailing dumps No1 and No2, and the slurry deposit. We are delighted to confirm that the project was not just completed to our exact specifications, but also in strict accordance with the design and contractual terms. The quality and precision of the work truly met our high expectations.
From 2014 to 2016, under the guidance of the Additional Agreement No. 9 dated January 27, 2014, we had the esteemed institute undertake the ambitious project of creating a technological complex for the processing of titanium-zirconium ore at the Motronivsk-Annivsk section of the Malyshevsk deposit. This complex was designed to handle a capacity of 4.752 million tons per year for PJSC 'Krymsky TITAN'. We can affirm with great satisfaction that the work was completed in full congruence with our Terms of Reference. The institute's dedication to delivering high-quality results and adhering to the agreed-upon timeline was remarkable.
We express our immense satisfaction with the project conducted by the 'Institute GIRKHIMPROM' during 2015-2016, as per our contract (No. 44/15 dated September 1, 2015). The project was executed with exceptional quality and precision, fully aligning with the technical requirements. The professional approach and adherence to timelines demonstrated by the Institute were commendable. Their expertise significantly contributed to the success of our objectives.
We acknowledge and appreciate the exceptional work done by 'Institute GIRKHIMPROM' under contracts No. 45/13 and No. 46/13 in 2013 for technical and economic reevaluation and reconstruction in the Zakarpattia region. The projects were completed with high professionalism and met all the specified requirements, showcasing the institute's expertise and commitment to excellence."
Previous
Next